PSI and DSI for Subdivision

A Poorly demolished building site required Preliminary Site Investigation (PSI) and Detailed Site Investigation (DSI) before further subdivision works could commence. Several HAIL activities were carried out on-site, including asbestos contamination. LDE designed an extensive remediation plan to ensure the site was suitable for the proposed residential subdivision.

Location: Northland
Client: Confidential

About Us

Sectors

© 2004 - 2023  LDE Limited
menuchevron-up linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram