Skip to main content

Call us0800 397 566

AUNZ

International

Aldinga ASR Modelling

Project Overview

The Aldinga Aquifer Storage and Recovery Scheme (ASR) stores treated wastewater over the winter period when demand is low. Over summer the stored water is recovered and distributed for irrigation.

WGA was engaged to develop a numerical groundwater model and complete predictive simulations to support changes to the operating conditions for managed aquifer recharge systems using reclaimed water in the McLaren Vale Prescribed Wells Area.

The results showed that the most practical option to achieve the required recovery volumes was to install two new production wells in the central portion of the site and operate the system as a quasi-aquifer storage transfer and recovery system.

Gallery

Project Details

Region
International

Services

Markets

Let's talk about your project

Tell us what you're working on and our team will be in touch promptly.

Call usEnquire