Auckland
Auranga Residential Estate
Project Overview
Located in Drury, this development is a very large scale (84 ha) master planned subdivision involving over 200 affordable houses, and 1,350 new dwellings.
LDE worked with the civil engineer and the rest of the project team from its inception to provide:
• Geotechnical reporting to advance plan changes • Detailed investigations to support the Qualifying Development (QD1) stage, and stages 1 to 3 bulk earthworks designs, including foreshore regression and slope stability analyses • Construction observation and compliance aspects for QD1 and stage 1 bulk earthworks • Detailed investigations and design for infrastructure, comprising the main trunk gas route, bridge abutment widening through mudflats, and a temporary water reservoir



