Talk to us 0800 397 566
Talk to us 0800 397 566 or contact your local office

Slope Stabilisation and Realignment

Peer review and technical inputs into the slope stabilisation and realignment of significant failures within a 600m long, 40m high road cut slope.

Location: Pukeiti, Tokomaru Bay, East Cape
Client: Tairāwhiti Roads (NZTA/GDC)

About Us

Sectors

Offices

© 2004 - 2023  LDE Limited
menuchevron-up linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram