International
Refine Energy
Project Overview
WGA conducted In-Service Pressure Vessel inspections for Refine Energy’s Jingemia Production facility at Dongara, WA. Two of the Production Separators have corroded areas in the shell of the vessels.
To extend the life of the asset, WGA undertook engineering analysis to calculate the safe working life of the vessel and submitted documentation to Worksafe WA for the revised design registration.
Gallery
Project Details
- Region
- International



