Skardon River Barge Loading Facility
Delivered by Wallbridge Gilbert Aztec (WGA)
Skardon River, Australia
Project Overview
WGA provided design, documentation and construction support of a bauxite offloading facility at the Skardon River in far Northern Queensland. The scope included design of a Barge Loading Facility (BLF), a Marine Offloading Facility, cyclone moorings, navigation aids and a tidal gauge. As the site is very remote with limited access by road, the BLF was required first so that barges could offload the plant, equipment and personnel required to construct the main facility.
Gallery
Project Details
- Location
- Skardon River, Australia
- Delivered by
- Wallbridge Gilbert Aztec (WGA)



