Gisborne Water Supply Pipeline

LDE assessed the extent of a 70m wide defect-controlled landslide induced by high winds and causing critical failure of the city water supply pipeline.

Location: Tarewa Road, Gisborne
Client: Gisborne District Council

About Us

Sectors

© 2004 - 2023  LDE Limited
menuchevron-up linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram