Skip to main content

Call us0800 397 566

AUNZ

BHP Nelson Point Zero Energy

Delivered by Wallbridge Gilbert Aztec (WGA)

Port Hedland, Australia

Project Overview

WGA was engaged to provide engineering services to enable the decommissioning of significant, redundant assets within the Nelson Point iron ore production facility. The project scope included multiple assets within existing operating plant. Due to the accessibility, age, condition of the equipment and limited equipment identification numbering, emphasis on safe work methods and procedures was required particularly for redundant cable removal. The role also required detailed site investigation and design to ensure any existing operational electrical, control, instrumentation and communication services within the demolition boundaries were identified to ensure all services were relocated prior to demolition work commencing.

Gallery

Project Details

Location
Port Hedland, Australia
Delivered by
Wallbridge Gilbert Aztec (WGA)

Markets

Let's talk about your project

Tell us what you're working on and our team will be in touch promptly.

Call usEnquire