International
Findon Road
Project Overview
WGA lead the Civil Design team, in the design delivery of:
• Removing the existing Roundabout at Ferres Boulevard / The Lakes Boulevard / Findon Road intersection.
• Traffic signal upgrade, street lighting works and all other works to convert the existing roundabout at Findon Road intersection into a fully signalised intersection.
• Widening the approaches on Findon Road, Ferres Boulevard and The Lakes Boulevard intersection.
• Installation of on-road bicycle lanes.
Our role on this project was to develop the detailed design, and together with our subconsultants provide key input on all disciplines. This intersection, which is currently a roundabout, required the development of full signalised intersection with significant consideration of large number of constraints, e.g. right of way, services and existing bridge



