Skip to main content

Call us0800 397 566

AUNZ

International

Ore Haulage Roads, The Granites

Project Overview

WGA provided design and construction supervision of 42km of new road infrastructure, and the preliminary design of a further 40km of roads.

Geotechnical investigations revealed the presence of subsurface Palaeolithic channels. The lack of defined creek beds resulted in surface water lying for weeks before eventually disappearing beneath the sands.

To overcome this issue, laterite deposits located near the site were selected and used as road base material.

Gallery

Project Details

Region
International

Let's talk about your project

Tell us what you're working on and our team will be in touch promptly.

Call usEnquire